Inboxsmith

AI news videos

Microsoft Posts Specs For 800 Volt Datacenter Power

Microsoft published a post on its Azure blog on October 13, 2026, written for the Open Compute Project community at OCP Global Summit 2026. It describes what Microsoft is contributing to open datacenter hardware. Everything below comes from that post.

Watch on YouTube

Transcript

Microsoft published a plan to make artificial intelligence use less power. It reaches the electrical supply.

Microsoft's Azure blog posted this on October thirteenth. It contributes specifications to the Open Compute Project.

Microsoft backs eight hundred volt direct current. Mount Diablo separates power conversion and scales beyond a megawatt.

Microsoft says Mount Atlas nearly doubles cooling capacity within the same footprint, using separate water loops.

The post states Multipath Reliable Connection scales beyond one hundred thousand graphics processors.

Microsoft with Marvell and Oracle are publishing an open source hardware security design. This vendor post gives no deployment dates or verification.

Inboxsmith builds AI receptionists for small businesses. Please like and subscribe for more news.

Sources

Every claim in this video comes from the top ranking coverage of this topic. The claims and where each one came from:

We make Inboxsmith.

An AI receptionist that never misses a business call.

See how it works